Rampox Energy

  • Period: Feb 2024 – Jun 2024  
  • Location: South Africa
  • Client: ELIDZ / USAID – SAEP /Deloitte

Main Project features

To conduct grid impact studies for ELIDZ for the deployment of a 15 MWp / 12 (MWac) distributed solar PV system. CSIR previously conducted a solar PV system feasibility for deployment at the industrial zone. These grid impact studies were therefore a follow-on to assess the implications of implementing the PV system on the existing ELIDZ electrical network.

Position held: Engineering Consultancy

Activities performed:

  • Model the ELIDZ network on DIgSILENT PowerFactory
  • Test and verify the model(s) to be used in the grid impact studies
  • Conduct grid integration and impact analysis (load flow and minigrid system dynamic simulations)
  • Assess costs for different plant and layout configurations to justify infrastructural investments for the reticulation network.