- Period: Sep 2022 – April 2023
- Location: South Africa
- Client: EDF Renewables
Main Project features
Conduct power evacuation studies to determine the maximum generation connection capacity that can be integrated into the Eskom network at various connection points at substations within the area, based on limitations on the high voltage distribution network (HV limitations).
Position held: Engineering Consultancy
Activities performed:
- Undertake GCCA studies at various sites for integration of PV and Wind plants on the Eskom Transmission or Distribution networks.
- Consider link-in-link-out (LILO) connection options on Tx and Dx lines.
- Explore multiple connection options.
- Determine maximum generation capacity limits at various substations.
- Recommend the best POC for generation integration.
- Produce full GCCA reports with recommendations.