Rampox Energy

  • Period: Sep 2023 – Mar 2024
  • Location: South Africa
  • Client: ACES Renewables / Cullinan (Pty) Ltd

Main Project features

Undertake Feasibility studies for development of 150 MW solar PV plant at Cullinan re-habilitated Afrimat mine site in Pretoria. The feasibility studies investigated possible PV plant technologies, and configurations and outlined the best possible design for the PV plant.  Energy modelling and techno-economic studies were done to optimize the design so that its cost-effective and bankable.

Position held: Engineering Consaltancy

Activities performed:

  • Resource assessment of the plant site
  • Site assessments on the available land
  • Investigations of existing electrical infrastructure in the vicinity of the solar PV plant
  • Plant Design Considerations
  • Grid Impact Studies
  • Techno-economic studies / optimisation studies